Home What's New Message Board
BigPumpkins.com
Select Destination Site Search
Grower Diaries
 
Entry Date Nick Name Location
Saturday, December 02, 2017 bnot Oak Grove, Mn

Entry 297 of 347  
Grower Diary Menu
  Back to Previous Page
Show Full 2017 Diary
List Other Grower's Diaries
Submit to Your Own Diary
Step 2 complete. I have timed mist now. The solenoid is connected to the timer. Have it now set for one second on,two minutes off.This will adjusted based on plant observation. The accumulator has been added to keep pressure steady at the solenoid. I have installed valves to allow draining the pressure out of the system and installed a circuit for flushing.Next step- remove the bottom of the top container and install the drain to waste outlet on the bottom container. Then it will be mounting the components and making the setup look a bit more professional. Probably about two days before the seedlings will need their new home.
 



Top of Page

Questions or comments? Send mail to Ken AT bigpumpkins.com.
Copyright © 1999-2024 BigPumpkins.com. All rights reserved.